
your natural choice
Infographics
01
Ensure that the substrate is level, compact, dry — humidity ≤3% — free from dust and stains. If substrate is rough, use smoothing, fast setting skin-coat D-base 60, in case of cracks proceed in full restoration.

02
EP PRIMER PLUS S: Mix component A with component B in a ratio of 70:30 by weight.

03
Apply EP PRIMER PLUS S on the substrate with a roller. Consumption: 150 gr/m².

04
EP COLOR S: 24 hours after mix component A with component B in a ratio of 75:25 by weight.

05
Apply EP COLOR S homogeneously with the use of a mohair roller. Consumption 150-200 gr/m².

06
EP COLOR S: After 24 hours, apply a second layer of EP COLOR S with the use of a mohair roller. Consumption 100 – 150 gr/m².

07
Directly after the application of the second layer of EP COLOR S and while it is still wet, proceed with the flakes broadcast (available in various colors). Flakes consumption 50-300 gr/m² (depending on the desired finish).

08
24 hours after the flakes broadcast, proceed with surface smoothing treatment.

09
DECO TOP EVO: 24 hours after mix component A with component B in a ratio of 90:10.

10
Apply DECO TOP EVO homogeneously with the use of a mohair roller. Consumption 100 gr/m².

11
After 24 hours, the surface is ready for use/traffic.


